Charlotte Pipe Factory Expansion

Warehouse |

Project Description

This project consists of a 168,000 square foot addition to a plastic pipe manufacturing facility in Cedar City, Utah.  The heating system consists of a single large gas-fired air rotation unit with outside air ducts connected to it.  The office area is heated and cooled by furnace/condensing unit split systems.  The ventilation system for the factory floor consists of large roof mounted exhaust fans with manually operated louvers around the entire perimeter of the building.