East Meadows Elementary School

Education |

Project Description

This school was a standard plan developed for Nebo School District.  The 85,400 S.F. school consisted of 32 regular classrooms, 4 Kindergarten rooms, 1 classroom, 1 Resource and Media Center.  The HVAC system is a 4-pipe fan coil system with two boilers and an air cooled chiller.  All hydronic systems have primary/secondary piping with variable speed pumping.  The temperature controls are DDC with connection to a central district control system.  Classrooms with exterior exposure have minimum outside air and interior classrooms have economizers.