Project Description

These various projects were concluded over 2-3 years and included all areas of the building.  Both domestic water and heating water piping were replaced.  The boiler plant was also replaced with high efficiency condensing boilers.  This project touched all spaces of the facility and as such we developed CAD files of the school.  Currently, we are designing additions to the building and adding cooling throughout.