Weldon – Mountain Tech Office Building

Office |

Project Description

This new office building core and shell at the Lindon Tech Center will house 50,000 SF of office space.  The HVAC system utilizes efficient variable refrigerant heat pumps mounted on the roof to serve zone level fan coil units throughout the building.  A single large energy recovery ventilator with enthalpy wheel and modulating gas burner provides outside air to each fan coil system and exhausts air from the buildings’ restrooms.  Zone temperature is controlled by individual VRF controllers, HVAC systems were coordinated with architectural and structural components using Revit 3-D BIM software.